Brand: BAILEY
Model: INICT01
Origin: USA
Warranty: One year
Marketable location: Nationwide
Application: Spare parts modules for branded PLC and DCS systems
Higher requirements have been put forward for the centralized control function. In order to achieve automated adjustment of the power dispatch system, it is necessary to first meet the consistency of the power grid simulation and the entire database in the system. This places very high demands on the centralized control link in the power system dispatch process. However, all functions of the power dispatch system are implemented on their own independent basis. Therefore, it is difficult to achieve the basic requirement that the database in the power dispatch system is completely consistent with the power grid simulation.
The variability of power grid simulation in the power dispatch system has so far required a new modeling and data recording of the entire automation system in order to achieve good management in the power dispatch automation system, with the upgrading and renovation of existing substations and the continuous increase of new substations. And this is a huge systematic task, any error in any link will have a great impact on power dispatch work. Therefore, we need to conduct in-depth exploration and research on the variability of power grid simulation in order to better improve and enrich the power dispatch automation system.
IBM Single Channel Ultra320 71P8594 / 78Y2482 SCSI CAR
6 UNITS OF CONOLOG Frequency Band Pass Filter FR4QX22YY
RO.VE.R. -SAT 6-WAY SPLITTER 5-2250 MHz / SO 506
2 OMNI SPECTRA 3101-6254-00 Freq. 8.2-12.4
2 units of Square D company transformer 64R-151
Rockwell V1456VQH-R5 Modem / ISA Sound Card